Generator installation, start to finish
- 1. Site evaluation — assess electrical panel, gas supply, and placement options
- 2. Size the generator based on your critical loads and whole-home needs
- 3. Coordinate gas line work (plumber referral if needed)
- 4. Install concrete pad and position the generator unit
- 5. Install automatic transfer switch (ATS) at your main panel
- 6. Wire, test, and commission the system — including simulated outage test
- 7. Pull permits and schedule inspection