Same-day service
(858) 400-4590
Electrical Panel Upgrade Cost in San Diego (2026): 100A to 200A

Electrical Panel Upgrade Cost in San Diego (2026): 100A to 200A

May 20, 20266 minute readReviewed by Michael Popovic

The short answer

A standard 100A-to-200A electrical panel upgrade in San Diego typically costs $4,000–$6,000 — including the panel, labor, permit, and inspection. Most jobs take 6–8 hours of on-site work. Meter or mast relocation, major code corrections, and larger services are quoted separately.

01

The short answer

A standard 100A-to-200A panel upgrade in San Diego typically costs between $4,000 and $6,000. Jobs that need a new meter location, a new service mast, major code corrections, or additional utility work require a custom quote.

ScenarioTypical cost
Standard 100A → 200A panel upgrade, same location$4,000 – $6,000
Upgrade with meter/mast relocation or major code correctionsCustom quote
400A service or larger / extensive SDG&E coordinationCustom quote

02

What's included

  • The new panel (and meter main, if required).
  • Labor to remove the old panel and install, wire, and label the new one.
  • The electrical permit and the inspection.
  • Bringing grounding and bonding up to current code — often missing in older homes.

03

What moves the price

  • Service size — 100A → 200A is routine; 200A → 400A costs more (bigger gear, sometimes two panels).
  • Meter or mast relocation — moving where power enters the home adds labor and SDG&E steps.
  • SDG&E coordination — a service upgrade usually needs the utility to disconnect and reconnect, plus a work order.
  • Panel location — a tight garage corner or an exterior wall behind landscaping adds time.
  • Code corrections — older homes often need grounding, bonding, or wiring brought up to code at the same time.

04

The SDG&E step most quotes forget

A panel swap that keeps the same service size is mostly an in-and-out day. But a true service upgrade (more amps, or moving the meter) requires coordination with San Diego Gas & Electric — a work order, a disconnect/reconnect, and sometimes their own scheduling timeline.

We handle that coordination for you and tell you up front when it applies, so the project timeline is clear before you commit.

These are typical ranges, not a quote. Your number depends on your specific panel, location, and whether SDG&E coordination is needed — which we confirm during a free assessment.

Official sources

Common questions

Before you decide.

How long does a panel upgrade take?+

The physical swap is usually 6–8 hours. If SDG&E coordination or a meter relocation is involved, the overall project can span a few days to a couple of weeks once scheduling and inspection are factored in.

Will my power be off during the upgrade?+

Yes — power is off for part of the day while the panel is replaced. We plan the timing with you so it is as painless as possible.

Is a permit required?+

Always. A panel upgrade changes your home's electrical service and must be permitted and inspected. We pull the permit and schedule the inspection.

Is a panel upgrade worth it?+

If your panel is full, undersized for modern loads (EV, AC, electric appliances), or a known hazard brand, yes — it improves safety and unlocks future upgrades like an EV charger or heat pump.

Ready when you are

Know enough to start the conversation?

Send us the project details. We will confirm the right scope and give you a clear written estimate.